7.3/10 (40 أصوات )




  • مرات التنزيل: 237
  • متطلبات التشغيل: Windows 2K
  • الحجم: 12.3 MB
  • الترخيص: Trial
  • الاصدار : 3.2
  • اضيف في: 0000-00-00 00:00:00
  • اخر تحديث: 20/11/2011
  • الموقع علي الانترنت:






Description

Gantt Chart is a modern and extremely easy-in-use project plan system. This system allows you to specify complex tasks sequences - a task or multiple tasks can be required to be completed before other tasks can be started. This program is designed for project management and allows you to create a personal profile and manage all the activities.Gantt Chart enables users to switch between profiles to view the schedule of any staff member, it is also possible to view multiple profiles simultaneously or open the schedules of several specialists at the same time. Once you've specified a required sequence, it is automatically visualized across a horizontal timeline. Task dependency is shown via connector lines. Gantt Chart can display completion percentage for each individual task. An overall progress indication option is also available. You can edit task dependencies, create new task connectors and of course re-schedule individual tasks. Gantt Chart also has the Auto Backup feature that allows saving the data to the secured archive. What is important, the data from Gantt Chart can be exported to many different formats, like MS Outlook, XML, HTML, XLS and TXT. It is also possible to import the data into the program. The program has a built-in Print Designer, which offers a variety of original templates and options to make a fine and clear printout of a schedule. There is a low-priced edition of the product for a workgroup that allows users to work simultaneously over the network.Requirements:

· CPU at 133 MHz or higher
· 64 MB RAM minimum
· 10 MB of available hard disk space
Limitations:

· 14-day trial
· Nag screen What's New in This Release: [ read full changelog ]

· New: overlapped / non overlapped items. Set the Intersection property to False to disable user event overlapping.





التعليقات علي Gantt Chart 3.2 (Trial)
اضافة تعليق

تعليقات الفيسبوك

تعليقات الموقع